Energy Storage Battery Cycle Log Industrial TF Card 3000 P/E Cycle LDPC ExFAT
Product Summary
Product Details
Energy Storage Battery Cycle Log
,3000 P/E Cycle Endurance
,LDPC ExFAT Volume Protection
Product Description
An energy storage battery cycle log is the document a storage site is judged by, not the event that triggered the review. State of charge, stack voltage, coolant temperature, power conversion throughput and protection trips are written to local media at short fixed intervals, and that file is what an asset owner, an insurer or a grid operator reads when output slips for a week. When the only copy sits in a cloud dashboard, the record depends on a modem and a subscription that may have been offline during exactly the window under examination.
An industrial TF card keeps the primary energy storage battery cycle log inside the cabinet on removable media a technician can pull and read on a laptop without a network. Capacity runs 64GB, 128GB and 256GB over the SD6.1 UHS-I interface, formatted exFAT so a multi year folder stays inside one volume. For storage duty the sustained write figure matters more than a burst number, and U3 V30 classes hold the write pipeline open while a gateway merges several power conversion streams into a single log.
Thermal margin decides service life. A container in strong sun pushes internal air past 60C and a winter night in a northern yard drops below -20C, so the -25C to 85C window has to cover both ends without derating. A 3000 P/E cycle endurance rating sets the rewrite budget for an industrial TF card overwritten every five minutes for years, and LDPC error correction keeps the exFAT volume mountable after a cabinet is switched off without a shutdown command, which happens on site far more often than commissioning documents admit.
Every lot is cycled through the full window in a thermal chamber, written at class for sustained periods and capacity checked before packing, with the record filed against the lot number. That evidence lets an EPC contractor attach a document to a handover dossier instead of quoting a datasheet claim, which is the practical difference between a spare part and a qualified component.
| Model | Capacity | Speed Class | Read / Write | File System |
|---|---|---|---|---|
| S2504GTLCA | 4GB | C10 U3 V30 A1,A2 | A1:90 / 50 MB/s A2:180 / 150 MB/s | FAT32 |
| S2508GTLCA | 8GB | C10 U3 V30 A1,A2 | A1:90 / 50 MB/s A2:180 / 150 MB/s | FAT32 |
| S2516GTLCA | 16GB | C10 U3 V30 A1,A2 | A1:90 / 50 MB/s A2:180 / 150 MB/s | FAT32 |
| S2532GTLCA | 32GB | C10 U3 V30 A1,A2 | A1:90 / 50 MB/s A2:180 / 150 MB/s | FAT32 |
| S2564GTLCA | 64GB | C10 U3 V30 A1,A2 | A1:90 / 50 MB/s A2:180 / 150 MB/s | exFAT |
| S25128GTLCA | 128GB | C10 U3 V30 A1,A2 | A1:90 / 50 MB/s A2:180 / 150 MB/s | exFAT |
| S25256GTLCA | 256GB | C10 U3 V30 A1,A2 | A1:90 / 50 MB/s A2:180 / 150 MB/s | exFAT |
| S2564GTLIA | 64GB | C10 U3 V30 A1,A2 | A1:90 / 50 MB/s A2:180 / 150 MB/s | exFAT |
| S25128GTLIA | 128GB | C10 U3 V30 A1,A2 | A1:90 / 50 MB/s A2:180 / 150 MB/s | exFAT |
| S25256GTLIA | 256GB | C10 U3 V30 A1,A2 | A1:90 / 50 MB/s A2:180 / 150 MB/s | exFAT |
| S2564GTLIH | 64GB | C10 U3 V30 A1,A2 | A1:90 / 50 MB/s A2:180 / 150 MB/s | exFAT |
| S25128GTLIH | 128GB | C10 U3 V30 A1,A2 | A1:90 / 50 MB/s A2:180 / 150 MB/s | exFAT |
| S25256GTLIH | 256GB | C10 U3 V30 A1,A2 | A1:90 / 50 MB/s A2:180 / 150 MB/s | exFAT |
| Parameter | Specification |
|---|---|
| Interface | SD6.1, UHS-I |
| Capacity | 64GB / 128GB / 256GB |
| Speed Class | C10, U3, V30, A2, A1 |
| Sustained Write | Up to 150MB/s |
| Sequential Read | Up to 180MB/s |
| Endurance | 3,000 program / erase cycles |
| Data Retention | 10 years at 25C |
| Operating Temperature | -25C to 85C |
| Storage Temperature | -40C to 85C |
| Error Correction | Advanced ECC with LDPC |
| File System | exFAT |
- Containerised energy storage cabinets recording charge and discharge cycles
- Central inverter rooms aggregating several conversion units into one cycle log
- Energy meter and power quality nodes on the same site bus
- Off grid and hybrid plants with no backhaul link to a monitoring platform
- Remote substations where a truck roll costs more than the media itself
- Extended -25C to 85C window suits sealed outdoor enclosures without added heating
- U3 and V30 classes sustain writes during multi unit aggregation instead of buffering to RAM
- LDPC correction preserves the cycle log after an unclean power down
- exFAT holds multi year folders from 64GB to 256GB without volume splitting
- One capacity family keeps spare parts stocking simple across a cabinet fleet
Why keep a local copy when the site already reports to a cloud platform?
Because the cloud path depends on a modem, a router and a subscription. When that chain breaks, the industrial TF card holds the only energy storage battery cycle log of what the site did during the outage, and it is the file a warranty discussion usually turns on.
How much history fits on each capacity?
Five minute text records with a few dozen parameters are small, so a 64GB unit typically holds several years for one cabinet. Waveform captures and event dumps consume space quickly, and those projects specify 128GB or 256GB.
Will the card survive a hot container in summer?
The rated window reaches 85C, which covers the internal air of most sealed cabinets under strong sun. Where a cabinet runs hotter, the correct fix is airflow or a remote logging enclosure, and our engineers say so rather than quote media that cannot meet the condition.
Is the 3000 P/E cycle endurance figure a lab value or a field value?
It is a validated figure from sustained write testing on production lots of this industrial TF card, and each delivery carries the matching lot record so the claim can be traced to the test bench rather than taken on trust.
Can the lot report be used in a commissioning file?
Yes. Thermal cycling between -25C and 85C, sustained write results and capacity verification are recorded per lot, and the report is issued with the matching lot number for the delivery.
PG builds industrial memory products in Shenzhen with CE, RoHS and FCC certified production. Thermal cycling and endurance reports are issued per production lot on request.